
29
CHAPTER2 CC-Link Unit
2-8 Timing chart
Timing charts are included so please refer to them when creating a sequencer (PLC)
program.
2-8-1 Handshake for starting data exchange
RX(n+3)8
RY(n+3)8
RX(n+3)B
RX(n+3)8 : Initial data request flag
RY(n+3)8 : Initial data end flag
RX(n+3)B : Remote READY
(1) When the controller starts up or when communication with the master station was
disabled because an error occurs in the CC-Link system, the controller turns RX(n+3)8
ON, and turns RX(n+3)B OFF.
(2) Check that RX(n+3)8 is set to ON, and then set RY(n+3)8 to ON from the master
station sequencer (PLC).
(3) After checking that RX(n+3)8 is set to ON, the controller turns RX(n+3)8 OFF, and
turns RX(n+3)B ON.
(4) Check that RX(n+3)8 is set to OFF, and then set RY(n+3)8 to OFF from the master
station sequencer (PLC). The actual data can now be sent and received.
■ The handshake operation is a process always necessary for normal communication
between the controller and the master station sequencer (PLC). The remote READY
output turns ON when the handshake is performed correctly. The robot sets to emer-
gency stop if this handshake operation is not performed, and then robot cannot oper-
ate.
■ The robot always sets to servo-off when the controller power is turned on. To operate
the robot, first perform the handshake operation, and then cancel emergency stop
while referring to “2-8-2 Dedicated input command execution” and then run the
SERVO (servo recovery) command.
Comentários a estes Manuais